Journal · 3 min read
What to agree before fitting day
Access, protection and responsibilities belong in the plan.
- Sheet
- J-04
- Status
- Fictional demo
- Drawn by
- Reyes Joinery
- Prepared
- 14 Oct 2026

By Erin Cole, Project coordinator · 3 min read

Before fitting, agree which room and access path need to be clear, what stays in place and who removes old cabinetry. Confirm where materials can be carried and where the team may work.
Electrical, plumbing, structural work and room repairs need their own scope. The workshop should explain the expected time on site and what happens if a hidden condition changes it.
At handover, check the moving parts together and keep the material care instructions. Bring concerns back to the workshop so the next step can be agreed.
Next step
Request a measure-up
Tell us what the room needs to do.
We review every brief and reply about a measure-up. A request books nothing and costs nothing.